A four-engine jet climbing out against an orange sunset sky
Transparent Seek · Coming to Workhorse ERP

See past your own dock.

Transparent Seek connects your shop to the suppliers and customers on every job. Know where outside work really is, get inspection data while your vendors measure, and choose suppliers on what they actually cost you.

Your ERP ends at your dock. Your customer’s due date does not. When an outside process runs late or a lot comes back out of tolerance, the problem started at a supplier you could not see.

Built into Workhorse ERPWorks with suppliers on any systemEarly access now open
How it is built

Transparent by choice, not by force.

There is no shared database. Each company keeps its own records and decides what leaves its system. Buyers decide what they require in return.

You choose what you share

Status, inspection data, photos and certificates are shared per order and per partner. Prices, routing notes and controlled technical data stay inside.

Buyers set the terms

A buyer can make live status and inspection data a condition of the PO, with receiving and payment held until the data is in.

Suppliers earn their grade

Sharing is scored. Suppliers who report live and honestly earn better grades, skip-lot receiving and a better rank when buyers choose vendors.

From PO to delivery

Follow an outside job through Transparent Seek.

These are the Transparent Seek screens inside Workhorse ERP, shown with sample jobs. Scroll to move from the overview to the customer’s tracking link.

01 · OVERVIEW

Every outside job on one screen.

Linked orders, suppliers that have gone quiet, lots missing inspection data and jobs at risk of missing their need date, all in one place.

Workhorse ERP · OverviewSample data
SupplyTransparent Seek
KK

Transparent Seek

Share with a customer
27Linked orders
4At risk of missing need date
6 lotsQC data missing
2Vendors gone quiet
9Customer links live
88%Network on time, 90 days

Needs attention

IssueOrderVendorDetail
Late riskWO 1187
Gearbox housing · Op 30 anodize
B 78 Vendor AETA 11/18/2026 vs need 11/14/2026
Critical path for Flap actuator FA-07
Open assembly
StaleWO 1192
Piston · Op 20 heat treat
C 61 Vendor CNo update in 3 days
Email-only vendor
Nudge vendor
AP holdPO 3310
Drive shaft, lot 22
A 94 Vendor BShipped, QC data not submitted
Invoice held until data is in
View PO
NCRWO 1180
Bracket rev C · anodize
B 80 Vendor DReported coating 0.0021 in, measured 0.0014 in
Integrity score hit
Open NCR
ProbationVendor C
Heat treat
C 61 Vendor CGrade fell 9 points in 90 days
Receiving inspection now 100%
Scorecard

Supplier network

A 94
Vendor B
Drive shafts · Workhorse ERP
Live
B 84
Vendor E
Fastener kits · ERP connector
Live
B 80
Vendor D
Anodize · ERP connector
Live
B 78
Vendor A
Anodize · Portal
1h ago
C 61
Vendor C
Heat treat · Email only
3 days

Customer links

Customer A
PO 44871 · portal link
Viewed 2h ago
Customer B
Flap actuator FA-07 · portal link
Viewed today
Customer C
3 orders · their ERP
Synced 5 min ago

Linked orders

Outside work and bought-in parts with live vendor data
OrderPartCustomerOutside opVendorVendor stageQC dataETA / needShared
WO 1187Gearbox housing × 50Customer BOp 30 anodizeB 78 Vendor ASeal · 1h ago3 of 411/18/2026
need 11/14/2026
Live link
WO 1192Piston × 200Customer BOp 20 heat treatC 61 Vendor CNo update 3 days0 of 211/15/2026
need 11/14/2026
Not shared
PO 3310Drive shaft × 25Customer BBought inA 94 Vendor BShipped 10/21/2026AP hold10/24/2026
need 10/30/2026
Live link
WO 1180Bracket rev C × 250Customer AOp 40 anodizeB 80 Vendor DReceived 10/27/2026NCR11/06/2026
need 11/06/2026
Live link
WO 1201Piston × 200Customer BOp 30 heat treatPick a vendor ranked by true cost—
need 11/20/2026
Not shared
02 · TRACK

The vendor’s progress shows on your traveler.

An outside operation stops being a black box. Each step the supplier completes appears on your traveler, next to your inspection plan and the results they reported.

Workhorse ERP · Traveler with a vendor operationSample data
Production · Work ordersTraveler · WO 1187
KK

Gearbox housing Rev B

Qty 50 · Customer B · for Flap actuator FA-07 · due 11/14/2026
At vendor · Op 30
Assembly view

Steps

Op 10
Saw cut 6061-T6 extrusion
Saw 1 · heat lot 7A2219 · 50 of 50
Done 10/16/2026
Op 20
Mill bores and mounting faces
Mazak cell · 50 of 50 · 24 IPIF checks pass
Done 10/22/2026
Op 30Anodize Type III, blackOutside process PO 3321 · sent 10/23/2026
B 78 Vendor A · supplier portal · last update 1h ago
Scorecard
Received 10/24RackedAnodizeSeal · nowInspectShip
Your inspection planSpecVendor reportedResult
Coating thickness0.0018–0.0025 in0.0019 in · 5 samplesPass
Color and finishBlack, uniformPhoto attachedPass
Thread maskingNo coating in threadsGo gauge, photoPass
Seal test certRequired—Waiting
Vendor promised
11/14/2026
Adjusted for their history
11/18/2026
Vendor A runs 3.6 days late on average on anodize.
Receiving and their invoice are held until all 4 inspection items are in. 3 of 4 submitted.
Op 40
Laser mark
Laser 1 · waiting on Op 30
Waiting
Op 50
Final inspection and pack
QC room · IPIF final plan
Waiting

Part passport

Every company that touched this lot, in one record.
Heat lot 7A2219 certified
Mill · 10/12/2026 · material cert
Received and inspected
CSigma · 10/14/2026 · CS/R1/S2/L
Machined, Op 10 to 20
CSigma · 10/22/2026 · 24 checks pass
Received at Vendor A
Vendor A · 10/24/2026 · 50 pcs counted
Anodize complete
Vendor A · 10/27/2026 · thickness data
Sealing started
Vendor A · today · 1h ago
Open full passport
03 · WATCH

See their machine, not just their promise.

When a supplier also runs Workhorse ERP, their cycle times and downtime come through live, and the ship date is projected from how the job is actually running.

Workhorse ERP · Vendor productionSample data
Transparent Seek · Vendor productionVendor F · bearing pins
KK

Bearing pin BP-15 × 400 A 91

PO 3330 · Vendor F runs Workhorse ERP, so their machine data comes through live · for FA-15 actuator kits, Customer C
Live · updated 40 seconds ago
Their inspections
180 of 400Made so far
6:30Quoted cycle time
9:45Actual, last 20 parts
1h 50mDowntime today
10/27/2026Promised ship
10/29/2026Projected ship

Parts made vs plan

Solid = actual · dashed orange = projection at the cycle time below · red line = promised ship
400 200 0 10/27 10/29 10/19 11/02
9:45
Vendor shifts
At 9:45 on 1 shift, Vendor F ships 10/29/2026: 2 working days late.

Their machine right now

Mill VF-2 · Op 20
Operator J. at Vendor F
Running
Last 12 cycle times (quoted 6:30)
Cycle jumped from 6:40 to 9:45 after the 10:40 tool change. Likely a slower feed or a different tool on Op 20.
Parts today31 · 30 good · 1 scrap
Downtime today1h 50m · tool breakage
Utilization this week71%

What it does to you

Bearing pins were due for kitting on 10/28. FA-15 kits for Customer C move from 10/30 to 11/03. The machine schedule has 2 open days on the Mazak cell 10/26 to 10/27 if you want to split the order.
04 · INSPECT

Catch a bad lot before it ships.

Suppliers record measurements on your inspection plan as they run. A drifting dimension raises an alert, and receiving inspection goes to 100% automatically.

Workhorse ERP · Supplier inspectionsSample data
Quality · Supplier inspectionsVendor F · BP-15 bearing pin
KK
Alert fired 11:52 today: Vendor F first-pass yield fell to 76% over the last 25 parts (your limit is 90%).
The bore on Op 20 is drifting toward the top of tolerance. It started right after their 10:40 tool change, the same moment their cycle time jumped.
158 of 180Passed their IPIF this lot
76%Yield, last 25 parts
18Bore failures
0.86Bore Cpk (was 1.71)
75 partsProjected short of 400

Ø0.3750 ±0.0005 bore · their last 30 readings

Red = out of tolerance · arrives as their operator saves each IPIF run
.3755 .3750 .3745 Tool change 10:40 Part 151 Part 180 · now

Where the failures are

Ø0.3750 bore
18
Thread depth
3
Chamfer 0.020
1
Overall length
0

Can you trust their numbers?

Their bore gaugeBG-04 · calibrated 09/12/2026
Your check on lot 1Matches their data
Integrity score96 · reports failures honestly

Impact on you

76%
Good parts expected325 of 400
FA-15 kits for Customer C325 ship 10/30 · 75 wait
Remake time for the shortfall1.7 shifts at Vendor F
Receiving inspectionRaised to 100% automatically
05 · GRADE

Suppliers graded on evidence.

Delivery, quality, transparency, integrity and responsiveness are scored from real job data, weighted toward the last 90 days. The grade sets how each supplier’s lots are received.

Workhorse ERP · Vendor scorecardSample data
Supply · VendorsVendor C
KK
C61

Vendor C

Heat treat · approved since 03/2024 · 38 jobs scored · email only, no live data
ProbationDown 9 points in 90 daysShared with vendor

Score by category

Delivery
25% weight
74% on time · 2.6 days late on average
72
Quality
30% weight
1,900 PPM · 2 minor NCRs · no escapes
81
Transparency
15% weight
No live status · QC data on 5 of 12 lots
38
Integrity
20% weight
1 report vs receiving mismatch · ETAs miss by 3 days
55
Responsiveness
10% weight
Quotes in 3.1 days · NCR closed in 19 days
69
Last 90 days count most. Confidence: high (38 jobs).

What this grade does

Approved listProbation · new POs need admin OK
Receiving inspection100% of lots (A grade gets skip-lot)
Purchaser rankingRisk cost added to every quote
PaymentHeld until QC data is in

Path back to B

Join the supplier portal and report each step live · Transparency +30
Submit hardness data on every lot · Transparency +20
3 on-time lots in a row · Delivery +8

Score over 12 months

Dashed lines mark the B (75) and C (60) cut-offs
11/202510/2026

Evidence

Every point comes from a recorded event. The vendor sees this list and can dispute a line.
DatePOEventCategoryEffect
10/27/2026PO 3302Delivered 4 days after promiseDelivery−2.1Details
10/24/2026PO 3302No status update for 3 daysTransparency−1.4Details
10/20/2026PO 3288Hardness report not submittedTransparency−1.8Details
10/15/2026PO 3288Receiving check 1.5 HRC below their reportIntegrity−3.0Disputed
10/02/2026PO 3270On time, all checks passDelivery+0.9Details
06 · BUY

Pick the supplier with the lowest true cost.

Approved vendors are ranked by their quote plus what their late deliveries and rejected lots usually cost you, so the cheapest quote is not mistaken for the cheapest supplier.

Workhorse ERP · Purchaser vendor pickerSample data
SupplyPurchaser
KK

Purchaser

WOPartStepVendorSend byWO due
WO 1201Piston × 200Op 30 heat treatPicking below10/29/202611/20/2026Traveler
WO 1204Valve housing × 40Op 30 anodize—11/02/202611/24/2026Pick vendor
WO 1206Valve body × 300Op 20 nitride—11/04/202612/01/2026Pick vendor

Pick a vendor for WO 1201 · heat treat

Approved vendors for this process, ranked by true cost: quote plus what lateness and rejects usually cost you
$3,000
$6,000
VendorQuoteLate riskReject riskRisk costTrue cost
A 91 Vendor G
Workhorse ERP · live status and QC · 4 day lead
$2,050
5%
1%
$210
$2,260
Best true cost
B 80 Vendor D
ERP connector · QC data on every lot · 5 day lead
$1,820
15%
3%
$630
$2,450
C 61 Vendor C
Email only · no QC data shared · 6 day lead
$1,650
Lowest quote
35%
8%
$1,530
$3,180
Vendor G costs $400 more up front but saves about $920 once late and reject risk is priced in.
07 · SHARE

Give your customer the same view.

Send a customer a live tracking link for their order. You choose what they see. Prices, internal notes and controlled technical data are never shared.

Workhorse ERP · Customer tracking linkSample data
Sales · Customer ordersPO 44871 · Customer A
KK

Share live tracking

Bracket rev C × 250 · WO 1180 · ships 11/06/2026
Link active

What they can see

Milestones
Material in, machining, finishing, inspection, shipped
Ship date and progress
Moves automatically when the ETA changes
Quality documents
Certs, FAI and CoC once released
Inspection results
Summary of measured characteristics
Photos
Part and packing photos from inspection
Vendor names
Outside work shows as "outside process"
Never shown
Costs and internal notes
Prices, margins, routing notes
Never shown
They get an email on each milestone and when the ETA moves. Every view is logged. Drawings and controlled technical data never go through this link.
Preview · what Customer A sees
CΣCSigma Labs · order tracking
PO 44871 · Bracket, rev C
Qty 250 · lot 2026-1041
On track
Estimated ship 11/06/2026
Material received and certified
10/20/2026
Machining complete
10/24/2026
Outside process: finishing complete
10/27/2026
Final inspection
In progress · updated 2 hours ago
Shipped
Planned 11/06/2026
Quality documents
Material certDownload
First article reportDownload
Certificate of conformanceAt ship
Suppliers, POs and assemblies

Bring every supplier into the plan.

Suppliers join on whatever system they run, your requirements travel with every PO, and your own schedule reacts when a vendor slips.

01 · CONNECT

Your suppliers don’t need to switch software.

Any supplier can report each step and enter your inspection plan from a phone, with nothing to buy or install. Suppliers on Workhorse ERP or another ERP connect directly.

  • Workhorse ERP to Workhorse ERP. Status, cycle times and inspection results flow live
  • ERP connector. Suppliers on another ERP share status and inspection data
  • Supplier portal. Report steps and enter your inspection plan from a phone
  • Email. Still supported, with a lower transparency score
Workhorse ERP · Supplier portal on a phoneSample data
CΣCSigma Labs supplier portal
Signed in as Vendor A · PO 3321
Gearbox housing × 50
Anodize Type III, black · due back 11/14/2026
Received Racked Anodize Seal · now Inspect Ship
CSigma inspection plan · sample 3 of 5
Coating thickness
0.0018 to 0.0025 in
Pass
in
Color and finish
Black, uniform, no burns
Thread masking
Go gauge, no coating in threads
Seal test cert
PDF or photo
Missing
Photo of parts on the gauge
Required evidence
Missing
Shipping is locked until all inspection items and the photo are in. 2 of 5 done.
02 · FLOW-DOWN

Requirements travel with the PO.

The supplier PO carries your quality terms, pre-filled from the part, your customer’s flow-downs and the supplier’s grade. The supplier sees exactly what accepting it commits them to.

  • Data to share. Live status, inspection results on your plan, photos and certificates
  • Gates. Receiving and payment wait until the data is accepted
  • Customer terms included. AS9100 flow-downs and export-control terms carried to every sub-tier
Workhorse ERP · Supplier PO with quality flow-downSample data
Supply · PurchasingSupplier PO 3321 · draft
KK

PO 3321 · Vendor A B 78

Outside process for WO 1187 · need back 11/14/2026 · connects through the supplier portal
LineDescriptionQtyUnitTotal
1Anodize Type III, black, per MIL-A-8625 · Gearbox housing rev B · mask threads50$9.40$470.00

Quality requirements on this PO

Pre-filled from the part, the customer's flow-downs and Vendor A's grade. Each one becomes a term on the PO.
Data they share
Live status at each step
Received, racked, anodize, seal, inspect, ship
Inspection data on our plan
IPIF plan "Gearbox housing anodize v3" · 4 items · 5 samples per lot
Photo evidence
Parts on the gauge and the finished rack
Certificates
Seal test cert and CoC uploaded before ship
Gates
Hold receiving until data is complete
Parts can arrive but can’t go to the next op
Hold payment until data is accepted
Invoice waits in AP
Open an NCR on any failed reading
Buyer and quality are alerted right away
Raise receiving inspection if yield drops
Below 90% over the last 25 parts → 100% inspection
From Customer B's PO
AS9100 flow-downs
Right of access, counterfeit parts prevention, notify of changes
Required
Export-controlled data
Drawing shared only to verified US-person users
Required
Preview · what Vendor A gets in their portal
CΣNew PO from CSigma Labs
PO 3321 · Anodize, 50 pcs · back by 11/14/2026
To accept this PO you agree to:
Update the status at each step in the portal
Enter inspection results on CSigma’s plan (4 items, 5 samples)
Attach photos as evidence
Upload the seal test cert and CoC before shipping
Receiving and payment wait until data is accepted
AS9100 flow-downs and export-control terms
Accept POAsk a question
Why it matters for their grade
Full data sharing on this PO counts toward Vendor A’s transparency score and can earn them skip-lot receiving.
03 · LIVE QC

Inspection data while the vendor measures.

Every measurement your suppliers save against your plans appears the moment it is saved. A failed reading opens an NCR and alerts the buyer.

Workhorse ERP · Live supplier QC feedSample data
Transparent SeekLive QC feed
KK

Live QC feed

Every measurement your vendors save against your inspection plans, the moment they save it. No waiting for parts to arrive.
Live
214Measurements today
5Vendors reporting
23Failures today
380Parts cleared before shipping
2Lots on skip-lot receiving

Incoming

TimeVendorPart · sampleCharacteristicValueSpecResultEvidence
2:36:01 pmVendor FBP-15 · #184Ø0.3750 bore0.3756±0.0005FailGauge BG-04
2:35:24 pmVendor EFastener kit · 22Count check25 of 25Full kitPassPhoto
2:34:47 pmVendor AGearbox housing · 5Thread maskingGoGo gaugePassPhoto
2:34:10 pmVendor FBP-15 · #183Ø0.3750 bore0.3754±0.0005PassGauge BG-04
2:33:33 pmVendor DBracket rev C · rack 7Coating thickness0.00150.0018–0.0025FailPhoto
2:32:56 pmVendor FBP-15 · #182Thread depth0.3110.300–0.320PassGauge TD-2
2:32:19 pmVendor BDrive shaft · #23Bore straightness0.0008≤ 0.0010PassCMM file
2:31:42 pmVendor AGearbox housing · 4Coating thickness0.00190.0018–0.0025PassPhoto
2:31:05 pmVendor FBP-15 · #181Ø0.3750 bore0.3757±0.0005FailGauge BG-04

By open order

Gearbox housing · Vendor A98%
PO 3321 · 3 of 4 plan items in
BP-15 bearing pin · Vendor F76%
PO 3330 · bore drifting · open
Bracket rev C · Vendor D91%
PO 3318 · thin coating on 2 racks
Drive shaft · Vendor B100%
PO 3310 · CMM files attached · skip-lot
Piston · Vendor CNo data
PO 3302 · email only · nothing shared
Click any row to see the full plan, photos and their gauge. A failure opens an NCR and alerts the buyer automatically.
04 · ASSEMBLY TREE

Every part of the build, with live supplier data.

The assembly tree shows each component as a picture with its live state: in-house progress, vendor stage, inspection results and ETA. Parts that set the finish date are highlighted.

Workhorse ERP · Assembly tree with live dataSample data
FA-07flap
actuator
× 25 · need 11/14/2026 · projected 11/21/2026 · 7 days late
LateGone quietAt vendorIn-houseReadyNot started
60%
×1 ×1 ×1 ×1 ×1 ×1 ×1 ×1 ×1 ×1 ×1 ×1 ×1 ×1 ×1
PartsDrag onto the tree
Search part number or name
Mounting lug
ML-070 on hand
Piston
PS-0712 on hand
Clevis pin
CP-0764 on hand
Rod end bearing
RB-078 on hand
Actuator shaft
AS-073 on hand
Retaining ring
RR-0740 on hand
Drive gear
DG-0718 on hand
Seal retainer
SR-070 on hand
Gearbox housing
GH-070 on hand
Bearing pin
BP-15180 on hand
Drop to addto Housing group
Mounting lug
ML-07 · qty 2
05 · ASSEMBLIES

Plan the whole build on real supplier dates.

An assembly rolls up every in-house and outside part. Dates come from each supplier’s history rather than their promise, so the critical path is the real one.

  • Projected from history. Vendor promises or dates adjusted for how late each supplier runs
  • True critical path. See which part sets the finish date
Workhorse ERP · Assembly project viewSample data
Engineering · AssembliesFlap actuator FA-07
KK

Flap actuator FA-07

Qty 25 · Customer B · SO 2290
Build treeProjectCostsDocuments
See schedule impact
11/14/2026Need date
11/21/2026Projected finish · 7 days late
18%Chance of on-time
3 of 8Parts at vendors
Gearbox housingCritical path

Timeline

DoneIn-houseAt vendorInspectionLate, from vendor historyTodayNeed date
Part · state · source
10/1910/2611/0211/0911/16
Housing group
Saw
Op 20–40 Mazak · 66%
Anodize · Vendor D
QC
Vendor B machining · 90%
Their QC
Heat treat · Vendor C
+3 days
Op 10–20
Anodize · Vendor A
Laser
QC
+4 days
Mounting bracket group
Op 10–50 · Lathe 2 + Mill 3
QC
Vendor E · picked, ships 10/28
Final
Assembly + test (projected)

Gearbox housing

At vendor
Vendor A · B 78 · portal
Op 10–20 in-houseDone 10/22
Op 30 anodize, Vendor ASealing now · 3 of 4 QC items in
Op 40 laser markMoves 11/15 → 11/19
Op 50 final inspectionMoves 11/16 → 11/20
Critical path. Vendor A promised 11/14 but averages 3.6 days late on anodize, so the plan uses 11/18. Pulling this back 4 days puts the whole build on time.

Part states

Not started

Mounting bracket
Starts 10/27 · 7 days slack

In-house

Actuator housing
Mazak cell · 31 of 50

At vendor

Gearbox housing
Vendor A · sealing
Drive shaft
Vendor B · final QC
Piston
Vendor C · quiet 3 days

Ready

Fastener kit
Ships 10/28
Bushing
In stock
06 · SCHEDULE

Your schedule reacts when a vendor slips.

Vendor lanes on the machine schedule are fed by Transparent Seek. When a supplier date moves, you get suggested moves on your own machines.

Workhorse ERP · Machine schedule reacting to vendor datesSample data
ProductionMachine schedule
KK

Machine schedule

Part scheduleMachine scheduleShop floor
10/22/2026 to 11/23/2026 · vendor lanes are read-only, fed by Transparent Seek
Vendor A's gearbox housing now lands 11/18, so Flap actuator FA-07 can't be assembled before 11/19.
The assembly bench is booked 11/12 to 11/14 for it and would sit idle. Mounting bracket work on Mill 3 has slack it doesn't need. 3 moves below fix both.

Current plan

Orange = Flap actuator FA-07 · gray = other jobs · blue outline = moved
Machine
10/2210/2911/0511/1211/19
Mazak cell
Robot cell · 2 shifts
WO 1188 actuator housing · FA-07
WO 1210 valve body
WO 1215 bearing pins
Mill 3
1 shift
WO 1189 mounting bracket · FA-07
WO 1206 valve body · due 12/01
Lathe 2
1 shift
MB
WO 1199 pins
Laser 1
Marking
Upper
1210
GH
Assembly bench
Final assembly + test
FA-07 assembly · parts missing
SO 2302 · FA-03
Vendor A
Anodize · live via portal
Gearbox housing anodize · promised 11/14
+4 days
Vendor C
Heat treat · email only
Piston heat treat · promised 11/12
+3

Suggested moves

1
Swap the assembly bench slots
SO 2302 (FA-03, all parts in stock) takes 11/12 to 11/14. FA-07 moves to 11/19 to 11/21. SO 2302 ships 7 days early.
2
Run WO 1206 on Mill 3 first
Valve bodies finish 11/04 instead of 11/16. The mounting bracket still finishes 11/17, before assembly needs it.
3
Move gearbox housing laser marking to 11/19
Matches when the parts are actually back from Vendor A.
Nothing changes until you apply.

Slack against assembly start (11/19/2026)

PartReadySlack
Gearbox housing · Vendor A11/18/20260 days · critical
Mounting bracket · in-house11/10/20269 days
Piston · Vendor C11/15/2026 adjusted4 days
Actuator housing · in-house11/11/20268 days
Drive shaft · Vendor B11/10/20269 days
Fastener kit · Vendor E10/30/202620 days
A fighter jet silhouetted against a sunset
An open quality standard

Supplier transparency should be a standard, not a feature.

ISO 9001 made quality systems comparable from one shop to the next. We believe supply chain transparency needs the same: one common way to share status, inspection data and evidence, open to any shop on any software. Transparent Seek is how Workhorse ERP puts it into practice.

Early access

Bring your supply chain into view.

Transparent Seek is in development. Workhorse ERP customers and their suppliers can join early access and help shape it.

Join early access Explore Workhorse ERP